Notice on the RMUC 2025 Season Planning
2024-11-28
Participants: Teams from Chinese mainland, Hong Kong, Macau, Taiwan and overseas that have passed the RMUC 2025 Rules Exam. This section is required for both Tier-1 and Tier-2 Teams.
Participation:
- 1.For teams from Chinese mainland, Hong Kong, Taiwan, Macau: Teams participate collectively. Log into the registration system with the Captain’s account and submit your materials to the RoboMaster Forum.
- 2.For teams from overseas: Teams participate collectively. The Captain fill in the questionnaire(To be updated later.)
Submission Time:
- 1.For teams from Chinese mainland: December 9, 2024, 18:00 - December 11, 2024, 18:00 (Beijing Time)
- 2.For teams from Hong Kong, Taiwan, Macau and overseas: December 11, 2024, 18:00 - December 13, 2024, 18:00 (Beijing Time)
Submission Opportunity: 1
Passing Threshold: Scored 45% or higher
Submission Content:
The season planning requirements differ from those in the RMUC 2025 Participant Manual, please consider this notice as the authoritative source.
1. Season Plan: Refer to "[Template] RoboMaster University Championship Season Plan" (DOWNLOAD: Click to download), PDF
2. Season Schedule: Refer to "[Template] RoboMaster University Series Season Schedule" (DOWNLOAD : Click to download), Excel
3. Season Budget: Refer to "[Template] RoboMaster University Series Season Budget" (DOWNLOAD: Click to download), Excel
Submission Requirements:
1. PDF format: Source Han Serif, 10.5pt (小四号, Chinese), or Times New Roman (English); fixed 1.5x line spacing; document naming: School + Team Name + Section Name.
2. Excel format: Font: Source Han Serif, 11pt (Chinese), or Times New Roman (English); wrap text, auto-adjust row height and column width; unless otherwise necessary, all text should be vertically centered and uniformly left-aligned or center-aligned; document naming: School + Team Name + Section Name.
* Source Han Serif font package: Click to download.
Benefits for Passing the Assessment:
1. Obtain the product discounts associated with this section. Refer to the "RMUC 2025 Participant Manual" and "RMU 2025 Instructions for Purchasing Materials" for more details.
2. Eligibility to the Referee System Exam (basic) and Mid-term Progress Assessment
3. Teams that open-source their season planning and rank in the top 2 among all open-source teams can receive a prize of 5,000 RMB (pre-tax); those ranking from 3rd to 10th place can receive a prize of 1,000 RMB (pre-tax). Prizes will be awarded at the end of the season.
4. Since the content of the season planning is closely related to the work of the team management group (including the Captain, Vice Captain, and Project Manager), the score of the season planning will be used as an important criterion for selecting the Outstanding Captain(s) and Outstanding Project Manager.
Application to the Best Season Plan Award:
1. Make your season plan open source according to the following requirements
2.Deadline: December 23, 2024, 18:00 (Beijing Time)
3. Fill in and submit the following questionaire: https://djistore.wjx.cn/vm/h49XIGV.aspx
Open-source Specifications:
1. Teams from Chinese mainland, Hong Kong, Macau, Taiwan: Log in to the RoboMaster Forum and post the open-source documents under "My Team→Season Planning" and make it public; title format: [RMUC 2025] University Name + Team Name + Season Plan
2. Teams from overseas: Send the open-source season plan documents to robomaster@dji.com; subject format: [RMUC 2025] University Name + Team Name + Season Plan
Appendix: Season Plan Assessment: Content Requirements
Content | Section | Content |
Season Plan | Team goals | Organize team discussions and set and explain the team’s goals for each robot type and technical area in this season based on the team’s experience summary of the last season, including but not limited to technical breakthroughs, team members’ development, planning and operation, and competition results. |
Post-mortem analysis | Review last season's summary and analyze the reasons for any discrepancies between the planned objectives and the actual outcomes. Continuously explore the root causes of these issues, and develop and implement effective solutions for improvement. | |
Team culture | 1. Based on the review of last season’s cultural initiatives, define the cultural building goals and direction for the new season. 2. Learn about new team members’ perceptions and understanding of the competition culture and team culture for the new season. 3. Develop a practical and detailed culture-building plan based on the team’s current situation, goals, and direction. This plan should include a timeline, details, and the expected outcomes and execution plan for each activity. | |
Project analysis | 1. Study and interpret the rules of the new season, analyze the requirements for the design of each robot, and write down the ideas. 2. By robot types and technical areas, present findings from open-source data, material manuals, and relevant documents and resources (including but not limited to online videos and industrial standards). 3. Explain the new technical points the team is planning to develop in this new season based on the above requirements analysis, as well as existing technical points that need to be optimized or enhanced (new technical points and existing technical points should be explained separately); specify the goals for each of the above points, i.e., the results the team aims to achieve with the new technical points and the projected quantitative performance indicators after the existing technical points are optimized. Open-source materials or studies referenced during the research may be included as notes. Note: In the subsequent Mid-Term Progress Assessment, Final Robot Assessment, and Season Summary, teams will be required to conduct closed-loop analysis of project progress. Please complete the required documents with diligence and accuracy. | |
Team Management | Team management involves team structure, rules and regulations development, and cultural development. 1. Streamline the overall team structure and clarify the division of groups 2. Specify the requirements for management positions and define the responsibilities of the leaders 3. Define the selection requirements for official team members (35 vacancies) Rules and Regulations Development: Cultural Development: | |
Resource Availability Analysis | 1. Analyze the available resources (funds, materials and manufacturing resources). This should be a recapitulative description. Figures should be included in the team’s budget report. 2. Plan the investment of the currently available resources and analyze whether current resources can support R&D plans. | |
Business and Promotional Plan | 1. Publicity: Develop an overall plan that aligns with the season's key projects and the actual situation of the team. 2. Sponsorship: Formulate a sponsorship proposal based on the team’s actual situation and needs. | |
Progress Report | 1. Specify the plan and timeline for robot building progress and acceptance check based on robot types and technical areas. The Mid-Term Progress Assessment includes a closed-loop acceptance check on the implementation of the corresponding part of the plan. 2. The schedule for the completion of other tasks (such as site set-up, tool debugging, etc.) 3. Manpower distribution plan (the number of people and time to be allocated for each module) | |
Budget Report | Prepare a well-founded budget plan according to funds that can be acquired, the expenses involved in the competition (the cost report from the previous season may be referred to), and the R&D plans for this year. Note: The categorization should be exhaustive and clear; the budget for robot development and lab management should be reasonable and specific. |
Season Plan Assessment: Rating Criteria
Content | Rating |
The Season Plan is written in accordance with requirements and is complete without any omissions or missing information. The plan is based on the team’s actual situation, with clear and reasonable goals, and fully demonstrated feasibility. Team management planning is clear, cost planning and budget is reasonable, and the business and promotional planning is complete. The plan is highly instructive for tasks during the Preparation Period, with innovative analysis methods used or extensive details provided. The plan also provides other teams with useful insights or methods for Preparation Period tasks. | S |
The Season Plan is written in accordance with requirements and is complete without any omissions or missing information. The plan is based on the team’s actual situation, with clear and reasonable goals, and adequately demonstrated feasibility. Team management planning is clear, cost planning and budget is reasonable, and the business and promotional planning is complete. The plan is highly instructive for tasks during the Preparation Period. | A |
The Season Plan is written in accordance with requirements and is complete without any omissions or missing information. The plan is based on the team’s actual situation, with relatively clear and reasonable goals, and adequately demonstrated feasibility. Team management planning, cost planning, and budget have some room for improvement. Business and promotional planning is basically complete. The plan is instructive for tasks during the Preparation Period. | B |
The Season Plan has some omissions or deviations from the content requirements. The plan strays from the team’s actual situation, with relatively clear and reasonable goals, and acceptable demonstrated feasibility (with a few feasibility issues). Team management planning, cost planning, and budget have significant room for improvement. Business and promotional planning lacks some information. The plan is instructive for short-term tasks during the Preparation Period. | C |
The Season Plan has serious omissions or major deviations from the content requirements. The plan far strays from the team’s actual situation and lacks feasibility demonstration (with many feasibility issues). The methods are not executable, and the goals are not clear or reasonable. Team management planning, cost planning, and budget have significant room for improvement. Business and promotional planning lacks lots of information. The plan is not instructive for tasks during the Preparation Period. | D |